How a campaign fits together
The orchestration canvas isn’t the campaign. It’s one of three views of the same campaign. An activity you add in the campaign’s list is a block on its canvas too. An activity block you add on the canvas shows up in the list.Where campaigns are managed
You build campaigns in Lobyco Nexus. Campaigns in the left menu has three entries.
Inside a campaign, the same three names switch between its views.
How Lobyco has set up your portal, and your user roles, decide which activity types you can add.
The activity pages under Toolbox are read-only, so build new activities in a campaign instead. The exception is Toolbox → Bubble, where you create a bubble.
Looking for examples?
For campaigns built end to end, see Use Cases. To put a flow on a schedule and check each run, see Schedule a campaign and check its results.Next steps
- Create a campaign — create the campaign from the list or from Orchestration, and add its first activity.
- Orchestration canvas — build the campaign’s flows, and decide what starts each one and who it reaches.
- Block reference — every block in the Block library, how to set it up, and what it passes on.
- Find and manage campaigns — find a campaign in the list or on the calendar, read its status, and edit or delete it.
- Schedule and run a campaign — give a flow its schedule, publish it, run it by hand and follow each run in History.
- Reuse with templates — save an activity as a template and start new activities from it.